Advant-Navis project is strategically located in one of the most prime regions in the NCR on Noida Expressway


specifications


General

1. The entire building envelope has been optimized by choice of materials and providing insulation wherever applicable. The thermal characteristics of envelope are as follows:

  • Wall Construction: Aerated Concrete Blocks on exposed surface with low overall thermal hear transfer coefficient.
  • Insulated roof using 65 mm thick extruded polystyrene to achieve low overall thermal heat transfer coefficient.
  • Double insulated Glass.

2.  Provision of ample natural lighting to optimize artificial lighting.

3.  Floor to floor height of 4.2mt.

 

HVAC SYSTEM

  • Water cooled central air conditioning plant with least power consumption.
  • Highly efficient, low power consuming, water chilling machines.
  • Variable speed chilled water pumping system to conserve pump operation power.
  • Use of high efficiency Blowers in HVAC System.
  • Provision in air handling units motors to install variable frequency drives by individual tenants.
  • Indoor air quality as per ASHRAE standard.
  • Superior noise and vibration control measures to prevent disturbance to tenant operations.  

 

ELECTRICAL SYSTEM

  • 33KV incoming power supply from electricity board grid.
  • Transformers with on load tap changers provided for superior voltage regulation.
  • All HT equipment like HT breakers and transformers shall be located away from building to avoid affect of electromagnetic radiations.
  • LV Power supply duly terminated at each floor through solid conductor rising mains with a suitable rating tap-offbox.
  • Dual supply energy meters at each floor for metering city and DG power separately.
  • Power factor to be maintained as 0.92 and above. All capacitors provided with Harmonic Filters to avoid distortion in voltage i.e., Clean Power will be available to tenants.
  • Dedicated risers for electrical and communication facilities on each floor with due consideration for avoiding¬†¬† electromagnetic radiations.
  • 100% power backup by diesel generator sets provided with PLC based auto synchronization load management.
  • Use of high efficiency motors for all moving equipment.

 

PUBLIC HEALTH ENGINEERING

  • Nearly two days of water storage at site.
  • Provision of treated water supply on each floor.
  • Sewage Treatment Plant for recycling the sewerage and use of recycled water generated for make-up to the Ac & DC cooling towers.
  • Ground water recharge by harnessing the rainfall on site.
  • Low water flow fixtures and fitting in toilets.

 

FIRE SAFETY

  • Automatic upright sprinkles on each floor as per National Building Code India.
  • Provision for tenants to lay their independent sprinkles line on each floors bellows false ceiling sprinkles.
  • Wet riser System with Fire Hose Cabinets at each emergency fire escape staircase.
  • External Hydrant System
  • Automatic Fire Detection and Alarm System.
  • Emergency Voice Evacuation System.

INTELLIGENCE
Building Automation System for reducing dependence on manual operation staff and to ensure optimum operating conditions.